The Water Resources Department of UPDL has carved a niche in the development sector in the recent past due to its excellent performance, especially in the water-scarce area of the Potohar region.
Our services under this spectrum cover all aspects from conceiving an idea to completion of a project, including master planning, pre-feasibility and feasibility studies, project planning, physical and simulation model studies, detailed designs, specifications, and tender documents, construction supervision, and contract management, preparation of operation & maintenance manuals, etc.
Our scope of services under the spectrum of Water resource development includes but is not limited to the following:


A-2 Reservoir (4 Lacs Gallons)
Scope of Services Concept Planning, Master Planning, Infrastructure/Services Design, Construction Supervision, Liaison/Securing Approvals from the Regulatory Bodies, Building Control, Asset Management, and Project Management Services.

GLC-06-UGWT
Drafting of complete building by- laws of Technopolis encompassing architectural, structural, MEP, firefighting, parking, and urban design aspects at par with international standards and local requirements.

Bore Development With Air Compressor
Scope of Services Concept Planning, Master Planning, Infrastructure/Services Design, Specialized Infrastructure Design Projects, Technical Studies, Solid Waste Management Plan, Gas Network, Telecommunication Network, Flood Water Management Design/ Rainwater Harvesting Plan, and Liaison with Regulatory Bodies.

Drilling Work At Gulberg Islamabad
Drafting of complete building by- laws for Gulberg Islamabad encompassing architectural, structural, MEP, firefighting, parking, and urban design aspects. ansoles 2/14045





